Skip to content
Vienna Lager Made with Red Shed

Vienna Lager Made with Red Shed

During harvest season, the days start getting shorter and the lagers start getting darker. We love a nice, malty, well-balanced lager. This month’s recipe is a Vienna Lager featuring some high-kilned malts to bring forward some fresh baking flavours and aromas while remaining thirst-quenching and easy drinking. This isn’t your father’s Old Vienna Lager!

Vital Statistics: 

ABV: 5.1% SRM: 10 IBU: 20 OG: 1.051 FG: 1.013 

Ingredients: 

Malt 

Penhold Pilsner – Red Shed (73.5%) 

19L Batch 

Brewhouse Efficiency: 72% 

10hL Batch 

Brewhouse Efficiency: 85%

Volume of Mash Water: 12L 

Volume of Mash Water: 515L

Volume of Sparge Water 19L 

Volume of Sparge Water 730L

Amount in KG 

Amount in KG

3.20 

145

Kananaskis - Red Shed (25.5%) 

1.10 

50

Black Bird - Red Shed (1%) 

0.05 

2.20



Hops 

Addition Time 

IBU 

19L Batch 

10hL Batch

Amount in KG 

Amount in KG

Tettnang AA 4.5% 

60 Minutes 

15.5 

0.028 

1.355

Willamette AA 5.5% 

10 Minutes 

4.5 

0.019 

0.910



Yeast: Escarpment Labs Autobahn Lager 

Strike Water Temperature: 74°C 

Water Profile: Cologne, Germany 

Mash Rest Temperature: 67°C 

Mash pH: 5.4-5.5 




Brewing Process: 

Mash: 

  • Heat strike water to 74c 

  • Add all malt and brewing salts to strike water 

  • Adjust mash ph with appropriate acid to reach desired brewing target 

  • Mash rest temp 67c for 1 hour. Confirm with iodine test 

  • Mash out at 78c, hold for 20 mins with vorlauf if possible 

Sparge: 

  • Sparge the mash with water acidified to a pH between 5.2 and 5.5. 

Boil: 

  • Boil target volume of wort. Length 70 min 

  • Add Tettnang at 60 min 

  • Add Williamette and Whrilfloc or Irish Moss at 10min

Cooling: 

  • Rapidly cool the wort with an ice bath or through a heat exchanger 

  • Add lightly diluted Yeast Lightening 

Fermentation: 

  • Collect cooled wort into fermentation vessel 

  • Add oxygen through carb stone or by rapidly shaking volume 

  • Pitch Escarpment Autobahn Lager at 10c 

  • On day 2 step temp to 11c 

  • On day 3 step temp to 12c 

  • Allow beer to ferment until 5 days of same gravity reading 

  • Once beer is terminal, drop temp by 2 degrees every day until you have reached 0c 

  • Scrub as much yeast and other protein out of fermentor 

  • Allow to lager between 4 and 6 weeks. 

  • Proceed to packaging in either canning, bottling or kegging 

  • Enjoy this beer at 2.6 volumes of CO2

 

Older Post
Newer Post
Close (esc)

Sign up to our newsletter!

Receive the latest news, updates and more directly to your inbox.

Age verification

By clicking enter you are verifying that you are old enough to consume alcohol.

Search

Your cart is currently empty.
Shop now
Liquid error (layout/theme line 245): Could not find asset snippets/ac-tiered-global.liquid